🌍 Ribb Irrigation Dam – South Gondar, Ethiopia

Rib-dam

Project Overview

  • River/Basin: Ribb River / Abay–Blue Nile Basin
  • Region: Amhara (South Gondar)
  • Dam Type & Specs: Earth-rockfill dam, approximately 73 m high
  • Reservoir Capacity: Approximately 234 million m³
  • Irrigation Area: Approximately 20,000 hectares
  • Dam Civil Work Contractor: Ethiopian Construction Works Corporation (ECWC)
  • Dam Instrumentation Sub-Contractor: GKM Consultants and Kistet Engineering

📌 The Ribb Irrigation Dam is a major earth-rockfill structure designed to create a large reservoir on the Ribb River, supporting extensive agricultural irrigation in the South Gondar region.

Kistet’s Scope of Work

In partnership with GKM Consultants, Kistet Engineering was subcontracted for the installation, testing, and commissioning of the dam’s comprehensive safety monitoring system. All instruments have been successfully installed.

✅ Dam Safety Instrumentation

Typical earth/rockfill dam instrumentation items (VW & standpipe piezometers, settlement/extensometers, inclinometer casings, earth pressure cells, seepage/weir monitors and etc...


✅ Data Acquisition and Control System
  • Configuration and setup of a central control panel for data consolidation.
  • DAQ+MUX, visualization, cabling, OVP/power, install/T&C) including but not limited to i

    nstallation of Campbell Scientific dataloggers for reliable, automated data collection.
  • Programming and configuration using LoggerNet software to manage the data acquisition schedule.
✅ System Testing and Commissioning
  • Comprehensive testing of all installed sensors and data acquisition components.
  • Final commissioning of the integrated monitoring system ahead of the project handover.
Gallery
Manufacturers / Technology Partners
Project Status
1. Contract Signed
Contract signed
2. Materials Procured
Materials purchased; dam construction pending
3. Under Construction/Installation
Materials purchased; dam construction pending
4. Commissioning Pending
5. Completed