Kessem Irrigation Dam – Afar, Ethiopia
Project Overview
📌 The Kessem
Irrigation Dam was built to power Ethiopia’s sugarcane expansion program.
Its massive reservoir supports large-scale irrigation, transforming arid lands
into fertile agricultural zones.
Kistet
Engineering, in partnership with GKM Consultants, was entrusted with the full-scale
instrumentation package for Kessem Dam.
Instrumentation
Supply & Installation
· VW piezometers, earth pressure cells, fill extensometer array, inclinometer casings, settlement anchors, VW weir monitor, GEOKON DAQ + multiplexers, VDV license, cables/conduits, surge protection/power, installation & training.
Data
Acquisition System
·
Installation of Geokon Data Acquisition Systems with multiplexers
·
LoggerNet programming for automated data collection
·
Real-time monitoring via Vista Data Vision (VDV) software
Training
& Capacity Building
·
Specialized on-site training for engineers and consultants
·
Safe handling of sensor cables during construction
·
Operation of readouts, loggers, and visualization software



